Handmade Cup Bag / Lunch Bag - Working Vehicles
Go to next photo Go to previous photo
Handmade Cup Bag / Lunch Bag - Working Vehicles
Handmade Cup Bag / Lunch Bag - Working Vehicles
Handmade Cup Bag / Lunch Bag - Working Vehicles
Handmade Cup Bag / Lunch Bag - Working Vehicles
Handmade Cup Bag / Lunch Bag - Working Vehicles
Handmade Cup Bag / Lunch Bag - Working Vehicles
Handmade Cup Bag / Lunch Bag - Working Vehicles

Handmade Cup Bag / Lunch Bag - Working Vehicles

10.00 $
Description
I made these items from fabric I bought for my child who loves construction vehicles. I had some fabric left over, so I made these two items.
I hope a child who likes construction vehicles will use them. Since I made these with the fabric I had, the lunch bag might be a little smaller than commercially available ones, but it should be fine for use at daycare or kindergarten. Please check the dimensions.
There might be some chalk marks left, but they will disappear after washing. The fabric is sturdy and durable. I did not pre-wash the fabric before making these.
The drawstring is black.

Cup bag: single drawstring closure
Lunch bag: double drawstring closure

These are handmade, so there may be some imperfections. Please understand this before purchasing.

#KindergartenPreparation
#DaycarePreparation
#PreschoolPreparation
#CupBag
#LunchBag
#ConstructionVehicles
#WorkingVehicles
#BoysVehicles
Details
Category
Kids' Tableware
Condition
New/unused
Shipping
Included in price (by seller)
From
Nagano
video
Delivery in 24/48 h

SHIPPINGS

Free shipping in Spanish mainland, Balearic Islands and Portugal.

For other countries the shipping cost will be paid by the client.

DELIVERY TIME (as of delivery)

Spanish mainland, Balearic Islands and Portugal: 1-2 working days.

Other countries, we attach a table with those that are open in the online store, indicating transporter and transit days.

Free returns

The return period is 14 calendar days from the receipt of the order.

Carriers for change of size in Spanish mainland, Balearic Islands and Portugal, are in charge of 24HRS.